Construction Projects

Open dashboard in new window
Note: This map does not contain city projects, township utility projects or work that is planned by the Michigan Department of Transportation.
Note: This map does not contain city projects, township utility projects or work that is planned by the Michigan Department of Transportation.

Understanding Asset Management

Below is a list of planned projects for the 2021 season. You can view current road work, closures and detours with our Interactive road closure map. You can also sign up for a weekly construction updates.

Updated: 5/11/21

Primary Road Improvements

TOWNSHIPSTREETSEGMENTTYPE OF WORK
Allendale68th Ave.M-45 to the Grand RiverMill & Resurface
Crockery112th Ave.Leonard St. to Cleveland St.Mill & Resurface
Georgetown48th Ave.Bauer Rd. to Pierce St.Mill & Resurface
8th Ave.Port Sheldon St. to Jackson St.Mill & Resurface
Cottonwood Dr.Bauer Rd. to Taylor St.Reconstruct to 3 Lanes
Grand HavenMercury Dr.Comstock St. to City LimitsMill & Resurface
Lakeshore Dr.Fillmore St. to Buchanan St.Mill & Resurface
Grand Haven/RobinsonFillmore St.U.S. 31 to 120th Ave.Mill & Resurface + 3' Shoulder
HollandQuincy St.120th Ave. to 96th Ave.Mill & Resurface + 4' Shoulder
ParkLakeshore Dr.168th Ave. to Lakewood Blvd.Mill & Resurface + 4' Shoulder
Port SheldonCroswell St.Lakeshore Dr. to U.S. 31Mill & Resurface + 3' Shoulder
Robinson104th Ave.M-45 to North Cedar Dr.Mill & Resurface + 3' Shoulder
TallmadgeLeonard St.48th Ave. to Linden Dr.Mill & Resurface + 3' Shoulder

Local Road Improvements

TOWNSHIPSTREETSEGMENTTYPE OF WORK
ChesterCrockery Shore Rd.West end to 24th Ave.Resurface Existing
Georgetown42nd Ave.Fillmore St. to Pierce St.Mill & Resurface + 2' Shoulders
Grand Haven161st Ave.Robbins Rd. to EndResurface Existing
Holland128th Ave.Beeline St. to Riley St.Mill & Resurface
Olive136th Ave.Port Sheldon St. to Tyler St.Resurface Existing
Blair St.U.S. 31 to 136th Ave.Resurface Existing

Local Gravel Road Improvements

TOWNSHIPSTREETSEGMENTTYPE OF WORK
Olive108th Ave.Taylor St. to Fillmore St.Reconstruct to Gravel & Pave in 2022
Robinson104th Ave.Pierce St. to M-45Reconstruct & Pave
136th Ave.Buchanan St. to Lincoln St.Reconstruct & Pave
Zeeland80th Ave.Felch St. to M-121Reconstruct & Pave

Countywide Road Millage Projects

TOWNSHIPSTREETSEGMENTTYPE OF WORK
Allendale68th Ave.M-45 to the Grand RiverMill & Resurface
Crockery112th Ave.Leonard St. to Cleveland St.Mill & Resurface
GeorgetownCottonwood Dr.Bauer Rd. to Taylor St.Reconstruct to 3 Lanes
Grand HavenLakeshore Dr.Fillmore St. to Buchanan St.Mill & Resurface
HollandQuincy St.120th Ave. to 96th Ave.Mill & Resurface + 4' shoulder
ParkLakeshore Dr.168th Ave. to Lakewood Blvd.Mill & Resurface + 4' Shoulder
Port SheldonCroswell St.Lakeshore Dr. to U.S. 31Mill & Resurface + 3' Shoulder
TallmadgeLeonard St.48th Ave. to Linden Dr.Mill & Resurface + 3' Shoulder

Bridge Improvements

TOWNSHIPSTREETPROJECT LOCATIONTYPE OF WORK
Chester32nd Ave.Over Rio Grande CreekReplacement

Large Culvert Projects

TOWNSHIPSTREETPROJECT LOCATION
Chester32nd Ave.1/4 mile north of Harding St.
Georgetown48th Ave.1000' south of Fillmore St.
Spring LakeBoom Rd.200' east of 152nd Ave.
TallmadgeLeonard Rd.1950' east of 40th Ave.
Robinson104th Ave.2680' south of Johnson St.
104th Ave.3100' south of Johnson St.

Cape Seal Surfacing

TOWNSHIPSTREETSEGMENT
Blendon72nd Ave.Van Buren St. to Fillmore St.
Blendon/GeorgetownBauer Rd.72nd Ave. to 24th Ave.
48th Ave.Chicago Dr. to Bauer Rd.
Holland/Olive136th Ave.Quincy St. to Port Sheldon St.
Port Sheldon/OlivePort Sheldon St.Butternut Dr. to U.S. 31

Seal Coat (Chip Seal) Surfacing

TOWNSHIPSTREETSEGMENT
Allendale40th Ave.North of M-45
46th Ave.Rich St. to Pingree St.
56th Ave.M-45 to Warner St.
60th Ave.Alger St. to M-45
72nd Ave.South of Osborn St.
74th Ave.South of Buchanan St. to Warner St.
76th Ave.Fillmore St. to Pierce St.
76th Ave.Warner St. to Osborn St.
78th Ave.M-45 to Buchanan St.
84th Ave.M-45 to Warner St.
92nd Ave.Fillmore St. to N. of Pierce St.
92nd Ave.Warner St. to Buchanan St.
Alger St.64th Ave. to 56th Ave.
Lincoln St.68th Ave. to 60th Ave.
Osborn St.76th Ave. to 68th Ave.
Pierce St.96th Ave. to east of 88th Ave.
Pierce St.78th Ave. to 60th Ave.
Pingree St.46th Ave. to end
Rich St.West of 48th Ave. to 46th Ave.
Warner St.68th Ave. to 64th Ave.
RobinsonRich St.144th Ave. to 120th Ave.
112th Ave.Buchanan St. to Lincoln St.
120th Ave.Lincoln St. to North Cedar Dr.
128th Ave.Lincoln St. to Green St.
136th Ave.North Cedar Dr. south to end
132nd Ave.North Cedar Dr. south to end
Sleeper St.128th Ave. to 120th Ave.
Olive100th Ave.Bingham St. to Port Sheldon St.
104th Ave.Van Buren St. to Tyler St.
104th Ave.Baldwin St. to Fillmore St.
112th Ave.New Holland St. to Polk St.
112th Ave.Stanton St. to Fillmore St.
116th Ave.South of Polk St. to Taylor St.
Baldwin St.104th Ave. to 96th Ave.
Bingham St.100th Ave. to 96th Ave.
Blair St.104th Ave. to 96th Ave.
New Holland St.120th Ave. to 96th Ave.
Polk St.120th Ave. to 96th Ave.
Stanton St.120th Ave. to 96th Ave.

Subdivision Resurfacing

TOWNSHIPSTREETSEGMENT
AllendaleBent Tree Dr64th Ave West to Cul-de-sac
Edgewater DrLake Michigan Dr North to Cul-de-sac
Horizon LnTallpine Ln East to Cul-de-sac
Maple Bend Trl60th Ave to Tallpine Ln
Tallpine LnSouth Cul-de-sac to North Cul-de-sac
Pinevalley CtPinevalley Dr South to Cul-de-sac
Waterline DrWaterpoint Dr to Waterway Dr
GeorgetownHagerview Ct28th Ave West to Cul-de-sac
Newcastle DrEnglehurst Dr to Ronson Ave
Parkway DrNewcastle Dr to Broadview Dr
Belvue LnBaldwin St South to Cul-de-sac
Melody LnBaldwin St South to Cul-de-sac
Bayview AveMiede St North to Cul-de-sac
Glendora AveCoral St to Robin St
Twin Homes StWalnut Ave East to Cul-de-sac
Walnut AveBaldwin St to Chippewa St
Astronaut AveSouthlawn St to Baldwin St
Eastlane AveSouthlawn St to Baldwin St
Miede StAstronaut Ave to Sunset Ave
Miede StEastlane Ave to Astronaut Ave
Parkwood St20th Ave to Birchwood Ave
Redwood DrBirchwood Ave to Englehurst Dr
Coconut DrTyler St to Baldwin St
Coconut DrBaldwin St North to Cul-de-sac
Magnolia DrTyler St to Baldwin St
Windgate DrTyler St to Baldwin St
Kevin CtRosewood St North to Cul-de-sac
Knollview DrCreek Ridge Dr to Rollingview Dr
Michael CtMichael Dr East to Cul-de-sac
Michael DrKevin Ct to Rolling Hills Ct
Angela StEric Ave to Todd Ave
Audrey StEric Ave to Todd Ave
Todd AveOlde Farm Dr to Audrey St
Olde Farm DrTodd Ave to Rosewood St
Olde Pine DrOlde Farm Dr to Rosewood St
Sugar Pine CtOlde Pine Dr East to Cul-de-sac
Sunflower WaySpencer Ave to 14th Ave
Woodhall CtSummerhill Dr SE to Cul-de-sac
Grand HavenBurkshire DrLakeshore Dr East to Cul-de-sac
Duneside DrLakeshore Dr West to Cul-de-sac
Lost Channel TrlRobbins Rd to High Ridge Dr
Charles CtSharon Ave West to Cul-de-sac
Sharon AveComstock St to Mercury Dr
HollandLindy AveMcKinley Ave to Roosevelt Ave
Garfield AveFranklin Ave to Jefferson St
McKinley AveFranklin Ave to Jefferson St
Union St120th Ave West to Cul-de-sac
129th AveScotts Dr North to End
Charles DrWest End to Roost Ave
Scotts Dr129th Ave to Roost Ave
Fifth AveRoost Ave South to Cul-de-sac
Roost AveFifth Ave to Lakewood Blvd
Roost CtRoost Ave South to Cul-de-sac
JamestownAllie CtMary Beth Ln North to Cul-de-sac
Carlie CtMary Beth Ln South to Cul-de-sac
Mary Beth LnSpringmist Dr to 22nd Ave
Mary Beth LnQuincy St to Springmist Dr
Springdew CtMary Beth Ln West to End
Springhill DrMary Beth Ln West to New Construction
Springline DrMary Beth Ln West to End
Springside CtSpringside Dr East to Cul-de-sac
Springside DrMary Beth Ln North to Cul-de-sac
Central PkwyQuincy St North to Cul-de-sac
ZeelandLogistic DrChicago Dr to 690' E of Empire Dr
Empire DrLogistic Dr South to End
Community LnMidgrove Dr to Settlement Ln
Community LnMidgrove Dr West to End
Groveside DrMidgrove Dr to 68th Ave
Midgrove DrGroveside Dr South to New Construction
Settlement LnCommunity Ln South to New Construction

How are roads selected for paving?

The Road Commission continuously evaluates road conditions to identify replacement, repair, and maintenance items. Project lists are developed with priorities based on the evaluation of data such as:

  • PASER Road Ratings
  • Traffic Volumes
  • Capacity and Congestion Issues
  • Accident History
  • Maintenance Problems
  • Funding Sources

Each year the Road Commission gathers input from local governmental officials, Metropolitan Planning Organizations (MPO), and the general public to determine improvement needs and develop a 5-year Strategic Improvement Plan.

Improvement needs not included in the Strategic Improvement Plan are typically addressed through the recurring, day-to-day maintenance activities by the Road Commission.

Since 100% of the costs associated with resurfacing or other surface treatments applied to Subdivision Streets have been paid by the Townships and/or residents, the Township’s determine which Subdivision Streets are selected.

How are signs for road construction areas determined?

When a construction project impacts the normal use of a county road, warning devices such as barrels, signs, and arrow boards are placed in accordance with a traffic control plan.

The basic objective of a traffic control plan is to permit construction work within the county road right of way in an efficient and effective manner, while maintaining a safe, uniform flow of traffic.

The construction work and motorists, bicycles, and pedestrians traveling through the work zone must be given equal consideration when developing a traffic control plan. Each traffic control plan is developed to be consistent with the Manual on Uniform Traffic Control Devices (MUTCD).

The Road Commission relies on the cooperation of various news media in publicizing the implementation of major road closures and detours as a method of keeping the public well informed.